IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

234

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0046 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $1,836 $682 Implemented
RU0046 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,698 $0 Implemented
RU0046 # 06 Y:1989 06 1989 CLOSE OFF UNNEEDED STEAM LINES $1,773 $1,880 Implemented
RU0019 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,019 $209 Implemented
RU0019 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,164 $0 Implemented
RU0019 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,736 $302 Implemented
RU0019 # 05 Y:1988 05 1988 IMPROVE LUBRICATION PRACTICES $764 $800 Implemented
RU0019 # 06 Y:1988 06 1988 COVER OPEN TANKS $2,983 $200 Implemented
RU0019 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,725 $0 Implemented
RU0007 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $180 Implemented
RU0007 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,804 $0 Implemented
RU0007 # 03 Y:1987 03 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,720 $5,000 Implemented
RU0007 # 04 Y:1987 04 1987 IMPROVE LUBRICATION PRACTICES $455 $0 Implemented
RU0002 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $22,514 $0 Implemented
RU0002 # 02 Y:1987 02 1987 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $30,280 $32,000 Implemented
RU0002 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,433 $5,670 Implemented
RU0002 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $178 Implemented
RU0002 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,751 $0 Implemented
ST0055 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $571 Implemented
ST0055 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $731 $0 Implemented
ST0055 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,219 $10,500 Implemented
ST0055 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $417 $250 Implemented
ST0055 # 05 Y:1986 05 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $626 $0 Implemented
ST0055 # 06 Y:1986 06 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,030 $3,750 Implemented
ST0055 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $834 $2,400 Implemented