IAC logo
IAC Assessment: ST0055
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0055
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1986
Principal Product METAL & PLASTIC STAMPING
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 0
Annual Production 7,000,000 Pieces
Production Hrs. Annual 2,125
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,577 1,361,079 kWh $0.12
Natural Gas $4,236 635 MMBtu $6.67
TOTAL ENERGY COSTS $165,813
RECOMMENDED SAVINGS* $10,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,562
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,705
Cost:
$571
$1,705 14,361 - - $1,705
14,361
kWh
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$731
Cost:
-
$731 6,155 - - $731
6,155
kWh
-
-
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$5,219
Cost:
$10,500
$5,219 43,962 - - $5,219
43,962
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$417
Cost:
$250
$417 3,517 - - $417
3,517
kWh
-
-
MMBtu
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$626
Cost:
-
$626 5,275 - - $626
5,275
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,030
Cost:
$3,750
$1,357 11,430 $(-327) (-49) $1,357
11,430
kWh
$(-327)
(-49)
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$834
Cost:
$2,400
- - $834 125 -
-
kWh
$834
125
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$383
Cost:
$590
$383 3,224 - - $383
3,224
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,945
Cost:
$18,061
$10,438 87,924 $507 76 $10,438
87,924
kWh
$507
76
MMBtu
TOTAL IMPLEMENTED Savings:
$10,562
Cost:
$17,471
$10,055 84,700 $507 76 $10,055
84,700
kWh
$507
76
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas