IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0104 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $419 Implemented
RU0104 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,006 $630 Implemented
RU0104 # 04 Y:1990 04 1990 COVER OPEN TANKS $433 $500 Implemented
RU0104 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,477 $0 Implemented
RU0104 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $996 $1,250 Not Implemented
RU0104 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,685 $63,000 Implemented
RU0104 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $592 $0 Implemented
RU0092 # 06 Y:1990 06 1990 USE OPTIMUM THICKNESS INSULATION $9,910 $80,000 Implemented
RU0092 # 05 Y:1990 05 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $546 $1,080 Not Implemented
RU0092 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $0 Not Implemented
RU0092 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $214 Implemented
RU0092 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,505 $500 Implemented
RU0092 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $34 Implemented
RU0087 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,858 $68 Not Implemented
RU0087 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $650 Not Implemented
RU0087 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented
RU0087 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,717 $3,492 Not Implemented
RU0087 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,877 $1,200 Not Implemented
RU0087 # 07 Y:1990 07 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $626 $170 Not Implemented
RU0087 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $150 $500 Not Implemented
RU0087 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,222 $9,000 Not Implemented
RU0077 # 05 Y:1990 05 1990 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,560 $340 Not Implemented
RU0077 # 04 Y:1990 04 1990 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $5,202 $450 Implemented
RU0077 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,140 $5,700 Not Implemented
RU0077 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,408 $650 Implemented