IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0242 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,001 $2,000 Implemented
LE0242 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,240 $6,400 Implemented
LE0242 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,843 $1,000 Implemented
LE0242 # 03 Y:2006 03 2006 REUSE / RECYCLE/ SELL PAPER PRODUCTS $7,219 $960 Implemented
LE0242 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,987 $20,000 Implemented
LE0242 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $734,219 $1,251,036 Implemented
LE0242 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $152 $75 Implemented
LE0242 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $651 $450 Not Implemented
LE0242 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $8,750 Implemented
LE0242 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $996 $1,000 Implemented
LE0238 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $902,617 $540,000 Not Implemented
LE0238 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,065 $90 Implemented
LE0238 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,077,481 $2,403,050 Not Implemented
LE0238 # 04 Y:2006 04 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $124,858 $17,600 Not Implemented
LE0238 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,609 $45,000 Implemented
LE0238 # 03 Y:2006 03 2006 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $335,810 $500 Implemented
LE0238 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,223 $1,000 Not Implemented
LE0238 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,471 $2,500 Not Implemented
LE0238 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,103 $2,500 Implemented
LE0238 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,870 $3,000 Implemented
LE0238 # 08 Y:2006 08 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,409 $3,000 Not Implemented
LE0234 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $46,545 $3,000 Implemented
LE0234 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $190,924 $500,000 Implemented
LE0234 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,195 $3,490 Implemented
LE0234 # 08 Y:2006 08 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $593 $60 Implemented