Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
82
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0097 # 02 Y:2012 | 02 | 2012 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,650 | $2,490 | Not Implemented |
DL0097 # 09 Y:2012 | 09 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $590 | $100 | Not Implemented |
DL0097 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,670 | $40,320 | Not Implemented |
DL0097 # 08 Y:2012 | 08 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $570 | $100 | Not Implemented |
DL0097 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,570 | $2,500 | Implemented |
DL0097 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,800 | $500 | Not Implemented |
DL0097 # 05 Y:2012 | 05 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,780 | $500 | Implemented |
DL0097 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,670 | $100 | Not Implemented |
DL0097 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,900 | $100 | Implemented |
LE0347 # 09 Y:2012 | 09 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $988 | $4,050 | Not Implemented |
LE0347 # 07 Y:2012 | 07 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,814 | $9,000 | Not Implemented |
LE0347 # 06 Y:2012 | 06 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $10,156 | $16,300 | Implemented |
LE0347 # 08 Y:2012 | 08 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $475 | $675 | Implemented |
LE0347 # 05 Y:2012 | 05 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,309 | $20,000 | Implemented |
LE0347 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,060 | $40 | Implemented |
LE0347 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,654 | $1,000 | Implemented |
LE0347 # 03 Y:2012 | 03 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,115 | $0 | Not Implemented |
LE0347 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $653 | $2,000 | Implemented |
DL0091 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,830 | $5,500 | Not Implemented |
DL0091 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,180 | $1,500 | Not Implemented |
DL0091 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,450 | $39,400 | Not Implemented |
DL0091 # 10 Y:2012 | 10 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,810 | $325 | Not Implemented |
DL0091 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,530 | $100 | Not Implemented |
DL0091 # 05 Y:2012 | 05 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,500 | $16,000 | Not Implemented |
DL0091 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $300 | Implemented |