Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0537 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,448 | $742 | Not Implemented |
DL0228 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,512 | $73,200 | Not Implemented |
DL0228 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,115 | $4,102 | Not Implemented |
DL0228 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,322 | $37,499 | Not Implemented |
DL0228 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,279 | $0 | Implemented |
DL0228 # 01 Y:2023 | 01 | 2023 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $4,024 | $700 | Implemented |
SU0537 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,763 | $500 | Not Implemented |
SU0537 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $38,869 | $390 | Not Implemented |
SU0537 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,744 | $0 | Not Implemented |
SU0537 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $939 | $0 | Not Implemented |
SU0537 # 02 Y:2023 | 02 | 2023 | DISCONNECT BALLASTS | $140 | $0 | Not Implemented |
SU0537 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,479 | $0 | Not Implemented |
SU0537 # 09 Y:2023 | 09 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,268 | $521 | Not Implemented |
SU0537 # 10 Y:2023 | 10 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $683 | $526 | Not Implemented |
SU0537 # 07 Y:2023 | 07 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,091 | $140 | Not Implemented |
DL0228 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,227 | $350 | Not Implemented |
SU0537 # 12 Y:2023 | 12 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $420 | $974 | Not Implemented |
SU0537 # 13 Y:2023 | 13 | 2023 | INSTALL OCCUPANCY SENSORS | $104 | $514 | Not Implemented |
SU0537 # 11 Y:2023 | 11 | 2023 | REDUCE VENTILATION AIR | $2,120 | $2,030 | Not Implemented |
LE0554 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,747 | $5,000 | Implemented |
LE0554 # 08 Y:2023 | 08 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,658 | $49,017 | Not Implemented |
LE0554 # 09 Y:2023 | 09 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $193,840 | $880,000 | Not Implemented |
LE0554 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,649 | $26,194 | Implemented |
LE0554 # 07 Y:2023 | 07 | 2023 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $31,394 | $144,000 | Not Implemented |
LE0554 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,873 | $35,440 | Implemented |