Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0574 # 11 Y:2005 | 11 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $840 | $6,120 | Not Implemented |
CO0574 # 10 Y:2005 | 10 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,830 | $6,160 | Not Implemented |
CO0574 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,350 | $12,520 | Not Implemented |
CO0574 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,410 | $1,420 | Not Implemented |
CO0574 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,000 | $41,750 | Not Implemented |
CO0574 # 06 Y:2005 | 06 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $450 | $110 | Not Implemented |
CO0574 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $162 | $118 | Implemented |
CO0574 # 04 Y:2005 | 04 | 2005 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $1,170 | $1,150 | Not Implemented |
CO0574 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,160 | $210 | Implemented |
CO0574 # 02 Y:2005 | 02 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,700 | $2,350 | Not Implemented |
CO0574 # 01 Y:2005 | 01 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,120 | $6,000 | Not Implemented |
CO0573 # 10 Y:2005 | 10 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,530 | $0 | Implemented |
CO0573 # 14 Y:2005 | 14 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $340 | $3,400 | Not Implemented |
CO0573 # 13 Y:2005 | 13 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $530 | $1,600 | Not Implemented |
CO0573 # 12 Y:2005 | 12 | 2005 | USE SOLAR HEAT FOR HEAT | $730 | $1,400 | Not Implemented |
CO0573 # 11 Y:2005 | 11 | 2005 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,340 | $0 | Implemented |
CO0573 # 09 Y:2005 | 09 | 2005 | USE OPTIMUM THICKNESS INSULATION | $3,590 | $5,150 | Not Implemented |
CO0573 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,930 | $13,186 | Implemented |
CO0573 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $8,750 | $4,790 | Implemented |
CO0573 # 06 Y:2005 | 06 | 2005 | USE SOLAR HEAT TO HEAT WATER | $28,910 | $121,820 | Not Implemented |
CO0573 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $500 | $780 | Implemented |
CO0573 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $520 | $2,950 | Not Implemented |
CO0573 # 03 Y:2005 | 03 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $961 | $752 | Implemented |
CO0573 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,040 | $1,030 | Implemented |
CO0573 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $99,230 | $295,000 | Not Implemented |