Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2005 |
Principal Product | Generator sets |
NAICS | 335312 - Motor and Generator Manufacturing |
SIC | 3621 - Motors And Generators |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 75 Pieces |
Production Hrs. Annual | 4,680 |
Location (State) | NM |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $109,060 | 2,740,800 | kWh | $0.04 |
Electricity Demand | $6,191 | 6,554 | kW-months/year | $0.94 |
Electricity Fees | $67,234 | - | $ | - |
Natural Gas | $149,756 | 18,329 | MMBtu | $8.17 |
TOTAL ENERGY COSTS | $357,431 | |||
RECOMMENDED SAVINGS* | $70,192 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,322 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $37,120 Cost: $6,000 |
$7,910 | 243,500 | $29,210 | - | - | - | - | - | - | - | - | - | - | - | - | - |
$7,910 243,500 kWh |
$29,210 - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $3,700 Cost: $2,350 |
$(-570) | (-11,600) | $(-500) | (-45) | - | - | $1,900 | 1,745,900 | - | - | - | - | - | - | $2,870 | - |
$(-570) (-11,600) kWh |
$(-500) (-45) kW-months/year |
- - MMBtu |
$1,900 1,745,900 Tgal |
- - gal |
- - $ |
- - $ |
$2,870 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,160 Cost: $210 |
$2,250 | 58,900 | $910 | 81 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,250 58,900 kWh |
$910 81 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER |
Savings: $1,170 Cost: $1,150 |
- | - | - | - | - | - | - | - | $360 | 132 | $330 | - | $480 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$360 132 gal |
$330 - $ |
$480 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $162 Cost: $118 |
$110 | 2,806 | $52 | 5 | - | - | - | - | - | - | - | - | - | - | - | - |
$110 2,806 kWh |
$52 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING |
Savings: $450 Cost: $110 |
$330 | 8,400 | $120 | 11 | - | - | - | - | - | - | - | - | - | - | - | - |
$330 8,400 kWh |
$120 11 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,000 Cost: $41,750 |
$8,220 | 200,200 | $5,750 | 513 | - | - | - | - | - | - | - | - | $30 | - | - | - |
$8,220 200,200 kWh |
$5,750 513 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
$30 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,410 Cost: $1,420 |
- | - | - | - | $3,410 | 424 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,410 424 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $3,350 Cost: $12,520 |
- | - | - | - | $3,350 | 417 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,350 417 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,830 Cost: $6,160 |
$(-180) | (-4,900) | $(-80) | (-7) | $3,090 | 384 | - | - | - | - | - | - | - | - | - | - |
$(-180) (-4,900) kWh |
$(-80) (-7) kW-months/year |
$3,090 384 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.9111 USE SOLAR HEAT TO HEAT MAKE-UP AIR |
Savings: $840 Cost: $6,120 |
- | - | - | - | $840 | 104 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$840 104 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,192 Cost: $77,908 |
$18,070 | 497,306 | $35,462 | 558 | $10,690 | 1,329 | $1,900 | 1,745,900 | $360 | 132 | $330 | - | $510 | - | $2,870 | - | $18,070 497,306 kWh |
$35,462 558 kW-months/year |
$10,690 1,329 MMBtu |
$1,900 1,745,900 Tgal |
$360 132 gal |
$330 - $ |
$510 - $ |
$2,870 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,322 Cost: $328 |
$2,360 | 61,706 | $962 | 86 | - | - | - | - | - | - | - | - | - | - | - | - | $2,360 61,706 kWh |
$962 86 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Water Consumption |