IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0092 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $200 Implemented
NV0092 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $629 $4,180 Implemented
NV0092 # 03 Y:1997 03 1997 OPTIMIZE PLANT POWER FACTOR $4,820 $24,919 Not Implemented
NV0092 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $291 $21 Implemented
NV0092 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $712 $246 Not Implemented
NV0092 # 08 Y:1997 08 1997 INSULATE BARE EQUIPMENT $1,493 $566 Not Implemented
NV0092 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $6,347 $716 Implemented
NV0092 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,147 $60 Implemented
NV0092 # 09 Y:1997 09 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $200 $120 Not Implemented
NV0089 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $483 $250 n/a
NV0089 # 12 Y:1997 12 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $211 $50 n/a
NV0089 # 11 Y:1997 11 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $300 $120 n/a
NV0089 # 10 Y:1997 10 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,804 $0 n/a
NV0089 # 09 Y:1997 09 1997 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,890 $840 n/a
NV0089 # 08 Y:1997 08 1997 OPTIMIZE PLANT POWER FACTOR $356 $1,047 n/a
NV0089 # 07 Y:1997 07 1997 INSTALL TIMERS AND/OR THERMOSTATS $240 $180 n/a
NV0089 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $967 $824 n/a
NV0089 # 04 Y:1997 04 1997 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $8,425 $815 n/a
NV0089 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,686 $946 n/a
NV0089 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $752 $246 n/a
NV0089 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,737 $650 n/a
NV0077 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $839 $50 Not Implemented
NV0077 # 05 Y:1997 05 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,167 $815 Implemented
NV0077 # 04 Y:1997 04 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,293 $2,925 Not Implemented
NV0077 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $353 $404 Not Implemented