IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0261 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $7,860 Implemented
SU0261 # 08 Y:2007 08 2007 REDUCE VENTILATION AIR $12,057 $13,919 Implemented
SU0196 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,000 $0 Implemented
SU0196 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,956 $0 Implemented
SU0196 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $653 Implemented
HO0097 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $4,372 Implemented
HO0097 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $278 $290 Implemented
HO0097 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $112 $505 Implemented
HO0097 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $265 $600 Implemented
HO0097 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,495 $280 Implemented
HO0097 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,625 $10,224 Implemented
RU0033 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $244 Implemented
RU0033 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $4,132 $402 Implemented
RU0033 # 07 Y:1988 07 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,018 $2,500 Implemented
RU0033 # 06 Y:1988 06 1988 REDESIGN PROCESS $7,218 $24,000 Implemented
RU0033 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,749 $0 Implemented
RU0033 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,137 $0 Implemented
RU0033 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,608 $302 Implemented