IAC logo
IAC Assessment: RU0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1988
Principal Product GLASS LENSES
NAICS n/a
SIC 3827 - Optical Instruments And Lenses
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 13,500,000 Pounds
Production Hrs. Annual 4,950
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,810 1,730,363 kWh $0.10
Natural Gas $13,595 3,033 MMBtu $4.48
TOTAL ENERGY COSTS $178,405
RECOMMENDED SAVINGS* $39,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,370
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$743
Cost:
$800
$743 7,913 $743
7,913
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,044
Cost:
-
$2,044 21,688 $2,044
21,688
kWh
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,608
Cost:
$302
$1,608 16,999 $1,608
16,999
kWh
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,137
Cost:
-
$3,137 33,118 $3,137
33,118
kWh
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,749
Cost:
-
$4,749 49,824 $4,749
49,824
kWh
06: 2.5194 REDESIGN PROCESS Savings:
$7,218
Cost:
$24,000
$7,218 89,390 $7,218
89,390
kWh
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,018
Cost:
$2,500
$14,018 - $14,018
-
kWh
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,132
Cost:
$402
$4,132 43,669 $4,132
43,669
kWh
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,508
Cost:
$244
$1,508 15,826 $1,508
15,826
kWh
TOTAL RECOMMENDED Savings:
$39,157
Cost:
$28,248
$39,157 278,427 $39,157
278,427
kWh
TOTAL IMPLEMENTED Savings:
$36,370
Cost:
$27,448
$36,370 248,826 $36,370
248,826
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage