IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

590

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0808 # 10 Y:2009 10 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,771 $1,840 Not Implemented
UD0808 # 11 Y:2009 11 2009 MODERATE COOLING TOWER OUTLET TEMPERATURE $18,970 $20,000 Not Implemented
UD0808 # 12 Y:2009 12 2009 UPGRADE CONTROLS ON COMPRESSORS $17,167 $0 Not Implemented
UD0808 # 13 Y:2009 13 2009 INSULATE BARE EQUIPMENT $15,493 $33,695 Not Implemented
UD0808 # 14 Y:2009 14 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $10,381 $34,730 Not Implemented
UD0808 # 15 Y:2009 15 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,291 $17,933 Not Implemented
UD0808 # 16 Y:2009 16 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,446 $1,000 Implemented
UD0808 # 17 Y:2009 17 2009 INSULATE BARE EQUIPMENT $8,068 $11,383 Not Implemented
UD0808 # 18 Y:2009 18 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,518 $21,818 Not Implemented
UD0808 # 19 Y:2009 19 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,269 $20,543 Not Implemented
UD0808 # 20 Y:2009 20 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,344 $7,155 Not Implemented
UD0808 # 21 Y:2009 21 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,836 $0 Implemented
UD0808 # 22 Y:2009 22 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,305 $18,884 Not Implemented
UD0808 # 23 Y:2009 23 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,412 $5,050 Not Implemented
UD0808 # 24 Y:2009 24 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,053 $0 Not Implemented
UD0808 # 25 Y:2009 25 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $0 Not Implemented
UD0774 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $118,235 $50,000 Not Implemented
UD0774 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $94,656 $6,000 Implemented
UD0774 # 03 Y:2008 03 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $83,440 $5,000 Implemented
UD0774 # 04 Y:2008 04 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,764 $4,008 Not Implemented
UD0774 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,705 $3,275 Implemented
UD0774 # 06 Y:2008 06 2008 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $9,454 $0 Implemented
UD0774 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,208 $12,758 Not Implemented
UD0774 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,237 $0 Not Implemented
UD0774 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,863 $6,540 Not Implemented