Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1018 # 02 Y:2020 | 02 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,174 | $26,600 | Not Implemented |
UD1018 # 03 Y:2020 | 03 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $25,124 | $0 | Not Implemented |
UD1018 # 04 Y:2020 | 04 | 2020 | REDESIGN PROCESS | $43,180 | $20,000 | Not Implemented |
UD1018 # 05 Y:2020 | 05 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,584 | $1,500 | Not Implemented |
UD1018 # 06 Y:2020 | 06 | 2020 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $16,717 | $64,900 | Not Implemented |
UD1018 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,072 | $0 | Not Implemented |
UD1018 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $359 | $392 | Not Implemented |
UD1018 # 09 Y:2020 | 09 | 2020 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $1,096,761 | $5,000,000 | Not Implemented |
UD1018 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $0 | Not Implemented |
UD1014 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $28,500 | $18,326 | Implemented |
UD1014 # 14 Y:2020 | 14 | 2020 | INSTALL OCCUPANCY SENSORS | $594 | $1,213 | Not Implemented |
UD1014 # 13 Y:2020 | 13 | 2020 | INSTALL OCCUPANCY SENSORS | $3,028 | $10,386 | Not Implemented |
UD1014 # 12 Y:2020 | 12 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,907 | $28,900 | Not Implemented |
UD1014 # 11 Y:2020 | 11 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,972 | $5,000 | Not Implemented |
UD1014 # 10 Y:2020 | 10 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,657 | $1,120 | Not Implemented |
UD1014 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,307 | $10,000 | Not Implemented |
UD1014 # 08 Y:2020 | 08 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $6,203 | $7,500 | Not Implemented |
UD1014 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $1,509 | $2,357 | Not Implemented |
UD1014 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $4,569 | $309 | Not Implemented |
UD1014 # 04 Y:2020 | 04 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $15,013 | $21,000 | Not Implemented |
UD1014 # 03 Y:2020 | 03 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $23,635 | $0 | Not Implemented |
UD1014 # 02 Y:2020 | 02 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $45,294 | $7,500 | Not Implemented |
UD1014 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,326 | $0 | Not Implemented |
UD1010 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,598 | $500 | Implemented |
UD1010 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $299 | $0 | Implemented |