Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2020 |
Principal Product | Canned Tomatoes |
NAICS | 311421 - Fruit and Vegetable Canning |
SIC | 2033 - Canned Fruits And Vegetables |
Sales | $50,000,000-$100,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 420,000 |
Annual Production | 40,000 Tons |
Production Hrs. Annual | 2,760 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $141,362 | 1,978,200 | kWh | $0.07 |
Electricity Demand | $2,448 | 651 | kW-months/year | $3.76 |
Electricity Fees | $127,211 | - | $ | - |
Natural Gas | $183,646 | 43,168 | MMBtu | $4.25 |
TOTAL ENERGY COSTS | $454,667 | |||
RECOMMENDED SAVINGS* | $60,941 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,103 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $3,598 Cost: $500 |
$3,598 | 50,355 | - | - | - | - | - | - |
$3,598 50,355 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $299 Cost: - |
$153 | 2,141 | $146 | 38 | - | - | - | - |
$153 2,141 kWh |
$146 38 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $7,123 Cost: $5,000 |
$5,748 | 80,438 | $1,375 | 366 | - | - | - | - |
$5,748 80,438 kWh |
$1,375 366 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $21,830 Cost: $20,000 |
- | - | - | - | $21,830 | 5,136 | - | - |
- - kWh |
- - kW-months/year |
$21,830 5,136 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $14,001 Cost: $60,000 |
- | - | - | - | $7,251 | 1,706 | $6,750 | - |
- - kWh |
- - kW-months/year |
$7,251 1,706 MMBtu |
$6,750 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $483 Cost: $5,500 |
- | - | - | - | $483 | 114 | - | - |
- - kWh |
- - kW-months/year |
$483 114 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,616 Cost: $7,457 |
$3,899 | 54,561 | $717 | 191 | - | - | - | - |
$3,899 54,561 kWh |
$717 191 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,704 Cost: $10,753 |
$3,071 | 42,977 | $635 | 169 | - | - | $(-2) | - |
$3,071 42,977 kWh |
$635 169 kW-months/year |
- - MMBtu |
$(-2) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,565 Cost: - |
$1,282 | 17,940 | $196 | 52 | - | - | $87 | - |
$1,282 17,940 kWh |
$196 52 kW-months/year |
- - MMBtu |
$87 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.5194 REDESIGN PROCESS |
Savings: $3,722 Cost: $43,500 |
$1,278 | 17,891 | $272 | 72 | $2,172 | 511 | - | - |
$1,278 17,891 kWh |
$272 72 kW-months/year |
$2,172 511 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,941 Cost: $152,710 |
$19,029 | 266,303 | $3,341 | 888 | $31,736 | 7,467 | $6,835 | - | $19,029 266,303 kWh |
$3,341 888 kW-months/year |
$31,736 7,467 MMBtu |
$6,835 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,103 Cost: $109,500 |
$5,029 | 70,387 | $418 | 111 | $9,906 | 2,331 | $6,750 | - | $5,029 70,387 kWh |
$418 111 kW-months/year |
$9,906 2,331 MMBtu |
$6,750 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |