IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

329

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0988 # 08 Y:2018 08 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,857 $11,500 Not Implemented
UD0988 # 09 Y:2018 09 2018 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,857 $6,000 Not Implemented
UD0986 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,289 $0 Not Implemented
UD0986 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,337 $0 Not Implemented
UD0986 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $37,147 $0 Not Implemented
UD0986 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $467 $0 Not Implemented
UD0986 # 05 Y:2018 05 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $455 $0 Not Implemented
UD0986 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,962 $2,000 Not Implemented
UD0986 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,246 $2,080 Not Implemented
UD0986 # 08 Y:2018 08 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $353 $50 Not Implemented
UD0986 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $193 $500 Not Implemented
UD0986 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,539 $17,808 Not Implemented
UD0967 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,073 $18,000 Not Implemented
UD0967 # 02 Y:2017 02 2017 OPERATE BOILERS ON HIGH FIRE SETTING $5,894 $27 Implemented
UD0967 # 03 Y:2017 03 2017 REPAIR OR REPLACE STEAM TRAPS $3,938 $7,676 Implemented
UD0967 # 04 Y:2017 04 2017 INSULATE FEEDWATER TANK $1,855 $4,743 Not Implemented
UD0967 # 05 Y:2017 05 2017 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $36,793 $4,925 Not Implemented
UD0967 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,466 $5,000 Not Implemented
UD0967 # 07 Y:2017 07 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $89,503 $0 Implemented
UD0967 # 08 Y:2017 08 2017 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $32,400 $4,662 Implemented
UD0967 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,781 $48,000 Not Implemented
UD0967 # 10 Y:2017 10 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,958 $0 Not Implemented
UD0967 # 11 Y:2017 11 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,362 $0 Not Implemented
UD0967 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $6,116 $2,824 Not Implemented
UD0967 # 13 Y:2017 13 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,271 $4,000 Not Implemented