IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

770

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0117 # 03 Y:1984 03 1984 INSTALL STORM WINDOWS AND DOORS $18,493 $22,385 Implemented
UD0117 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,694 $0 Implemented
UD0117 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $182 Implemented
UD0116 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,320 $3,000 Implemented
UD0116 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,013 $670 Implemented
UD0116 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $18,628 $99,000 Implemented
UD0091 # 06 Y:1983 06 1983 REDESIGN PROCESS $13,696 $30,000 Implemented
UD0077 # 02 Y:1983 02 1983 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,987 $2,000 Implemented
UD0077 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,967 $500 Implemented
UD0058 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,729 $2,704 Implemented
UD0058 # 04 Y:1982 04 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,600 $4,500 Implemented
UD0060 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,603 $4,366 Implemented
UD0060 # 02 Y:1982 02 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,089 $1,000 Implemented
UD0060 # 04 Y:1982 04 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,230 $46,000 Implemented
UD0060 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $618 $0 Implemented
UD0051 # 01 Y:1982 01 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $460 $0 Implemented
UD0051 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,295 $753 Implemented
UD0051 # 03 Y:1982 03 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,219 $6,160 Implemented
UD0051 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,504 $900 Implemented
UD0025 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $162 $0 Implemented