IAC logo
IAC Assessment: UD0077
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0077
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1983
Principal Product ELECTROPLATING,ANODIZING
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,652 1,923,212 kWh $0.06
Natural Gas $153,568 33,925 MMBtu $4.53
TOTAL ENERGY COSTS $263,220
RECOMMENDED SAVINGS* $13,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,954
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$963
Cost:
$354
$1,135 20,809 $(-172) (-32) $1,135
20,809
kWh
$(-172)
(-32)
MMBtu
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$3,987
Cost:
$2,000
- - $3,987 738 -
-
kWh
$3,987
738
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,967
Cost:
$500
- - $3,967 735 -
-
kWh
$3,967
735
MMBtu
04: 2.7421 REDUCE GLAZED AREAS IN BUILDINGS Savings:
$1,268
Cost:
$3,680
- - $1,268 235 -
-
kWh
$1,268
235
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,515
Cost:
-
$3,515 23,447 - - $3,515
23,447
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,700
Cost:
$6,534
$4,650 44,256 $9,050 1,676 $4,650
44,256
kWh
$9,050
1,676
MMBtu
TOTAL IMPLEMENTED Savings:
$7,954
Cost:
$2,500
- - $7,954 1,473 -
-
kWh
$7,954
1,473
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas