IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0138 # 03 Y:1984 03 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,854 $30,000 Not Implemented
UD0138 # 02 Y:1984 02 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,379 $15,000 Implemented
UD0138 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,759 $336 Implemented
UD0131 # 06 Y:1984 06 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,453 $20,000 Implemented
UD0131 # 05 Y:1984 05 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,576 $4,000 Implemented
UD0131 # 04 Y:1984 04 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,853 $800 Implemented
UD0131 # 03 Y:1984 03 1984 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,070 $8,000 Implemented
UD0131 # 02 Y:1984 02 1984 REDUCE GLAZED AREAS IN BUILDINGS $17,464 $50,000 Implemented
UD0131 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,171 $0 Implemented
UD0117 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $182 Implemented
UD0117 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,694 $0 Implemented
UD0117 # 03 Y:1984 03 1984 INSTALL STORM WINDOWS AND DOORS $18,493 $22,385 Implemented
UD0117 # 02 Y:1984 02 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,837 $2,000 Not Implemented
UD0117 # 01 Y:1984 01 1984 REDESIGN PROCESS $9,920 $18,000 Not Implemented
UD0116 # 01 Y:1984 01 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,546 $27,000 Not Implemented
UD0116 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,705 $3,000 Not Implemented
UD0116 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $28,956 $69,700 Not Implemented
UD0116 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $18,628 $99,000 Implemented
UD0116 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,013 $670 Implemented
UD0116 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,320 $3,000 Implemented