IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0065 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $662 $200 Implemented
UD0067 # 03 Y:1982 03 1982 INSTALL STORM WINDOWS AND DOORS $6,999 $7,642 Implemented
UD0067 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $12,896 $64,600 Implemented
UD0067 # 01 Y:1982 01 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,431 $250 Implemented
UD0067 # 05 Y:1982 05 1982 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,207 $286 Implemented
UD0064 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,281 $2,200 Implemented
UD0064 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,486 $2,126 Implemented
UD0064 # 01 Y:1982 01 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,885 $11,043 Implemented
UD0063 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $29,194 $42,215 Implemented
UD0063 # 03 Y:1982 03 1982 RECOVER WASTE HEAT FROM EQUIPMENT $1,592 $61 Implemented
UD0061 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $72 $0 Implemented
UD0067 # 04 Y:1982 04 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,770 $0 Implemented
UD0054 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $15,588 $146,250 Implemented
UD0054 # 04 Y:1982 04 1982 INSTALL STORM WINDOWS AND DOORS $20,425 $29,798 Implemented
UD0054 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,264 $8,000 Implemented
UD0054 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,558 $872 Implemented
UD0053 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,670 $92,250 Implemented
UD0045 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,451 $3,100 Implemented
UD0045 # 02 Y:1982 02 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,586 $7,000 Implemented
UD0045 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $400 Implemented
UD0041 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $420 $0 Implemented
UD0041 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $590 Implemented
UD0038 # 05 Y:1982 05 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,854 $10,000 Implemented
UD0038 # 03 Y:1982 03 1982 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $3,584 $1,500 Implemented
UD0038 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $721 $0 Implemented