IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0448 # 01 Y:1994 01 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,413 $20,000 Implemented
UD0448 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,964 $5,270 Implemented
UD0448 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,798 $6,200 Implemented
UD0448 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,068 $10,425 Implemented
UD0448 # 02 Y:1994 02 1994 REDUCE VENTILATION AIR $1,250 $2,500 Not Implemented
UD0440 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,640 $250 n/a
UD0440 # 05 Y:1994 05 1994 ADD AREA LIGHTING SWITCHES $1,454 $200 n/a
UD0440 # 04 Y:1994 04 1994 ADD AREA LIGHTING SWITCHES $2,496 $200 n/a
UD0440 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,786 $3,000 n/a
UD0440 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,448 $0 n/a
UD0432 # 02 Y:1994 02 1994 DISCONNECT BALLASTS $382 $2,400 Not Implemented
UD0432 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $772 $46,256 Not Implemented
UD0432 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,156 $75,000 Not Implemented
UD0431 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $20,078 $28,500 Implemented
UD0431 # 02 Y:1994 02 1994 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $18,567 $2,000 Implemented
UD0431 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $6,565 $5,000 Not Implemented
UD0431 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,395 $2,500 Implemented
UD0431 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $53,070 $50,000 Implemented
UD0425 # 02 Y:1994 02 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,026 $0 Not Implemented
UD0425 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,450 $0 Implemented
UD0425 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $398 $3,000 Implemented
UD0425 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,545 $15,950 Implemented
UD0425 # 05 Y:1994 05 1994 COMBINE UTILITY METERS $355 $0 Implemented
WV0017 # 06 Y:1994 06 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $274 $25 Not Implemented
WV0017 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $140 Not Implemented