IAC logo
IAC Assessment: WV0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1994
Principal Product Mine Supply and Industrial Cars
NAICS n/a
SIC 3532 - Mining Machinery
Sales $1,000,000-$5,000,000
# of Employees 57
Plant Area (Sq.Ft.) 111,340
Annual Production 0 Units
Production Hrs. Annual 3,120
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,868 929,367 kWh $0.05
Natural Gas $54,581 8,543 MMBtu $6.39
TOTAL ENERGY COSTS $104,449
RECOMMENDED SAVINGS* $20,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,865
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,540
Cost:
$2,498
$1,540 47,773 - - $1,540
47,773
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$567
Cost:
$2,760
$567 17,585 - - $567
17,585
kWh
-
-
MMBtu
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$5,550
Cost:
$250
- - $5,550 869 -
-
kWh
$5,550
869
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,053
Cost:
$775
- - $1,053 164 -
-
kWh
$1,053
164
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$454
Cost:
$140
$454 14,068 - - $454
14,068
kWh
-
-
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$274
Cost:
$25
$274 8,499 - - $274
8,499
kWh
-
-
MMBtu
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$652
Cost:
-
$652 20,223 - - $652
20,223
kWh
-
-
MMBtu
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$497
Cost:
$960
- - $497 203 -
-
kWh
$497
203
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,620
Cost:
$200
$9,620 298,359 - - $9,620
298,359
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,207
Cost:
$7,608
$13,107 406,507 $7,100 1,236 $13,107
406,507
kWh
$7,100
1,236
MMBtu
TOTAL IMPLEMENTED Savings:
$12,865
Cost:
$3,473
$11,812 366,355 $1,053 164 $11,812
366,355
kWh
$1,053
164
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas