Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0240 # 01 Y:1987 | 01 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,646 | $10,000 | Implemented |
UD0240 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $2,314 | $300 | Implemented |
UD0240 # 02 Y:1987 | 02 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $289 | $400 | Implemented |
UD0237 # 09 Y:1987 | 09 | 1987 | RECOVER AND REUSE COOLING WATER | $2,400 | $4,000 | Implemented |
UD0239 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,341 | $600 | Implemented |
UD0238 # 04 Y:1987 | 04 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,229 | $40 | Implemented |
UD0239 # 02 Y:1987 | 02 | 1987 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $23,356 | $10,000 | Implemented |
UD0239 # 04 Y:1987 | 04 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,069 | $6,000 | Implemented |
UD0238 # 01 Y:1987 | 01 | 1987 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $20,472 | $36,000 | Implemented |
UD0237 # 04 Y:1987 | 04 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $697 | $2,000 | Implemented |
UD0239 # 01 Y:1987 | 01 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,627 | $2,500 | Implemented |
UD0238 # 03 Y:1987 | 03 | 1987 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,600 | $250 | Implemented |
UD0238 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,814 | $0 | Implemented |
UD0237 # 05 Y:1987 | 05 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,129 | $0 | Implemented |
UD0237 # 02 Y:1987 | 02 | 1987 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $1,466 | $3,000 | Implemented |
UD0237 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,505 | $1,790 | Implemented |
UD0237 # 01 Y:1987 | 01 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,394 | $200 | Implemented |
UD0237 # 07 Y:1987 | 07 | 1987 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,948 | $4,140 | Implemented |
UD0237 # 08 Y:1987 | 08 | 1987 | MINIMIZE WATER USAGE | $3,986 | $2,000 | Implemented |
UD0237 # 06 Y:1987 | 06 | 1987 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,305 | $67 | Implemented |
UD0236 # 04 Y:1987 | 04 | 1987 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $6,699 | $28,000 | Not Implemented |
UD0236 # 01 Y:1987 | 01 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $102,264 | $500,000 | Not Implemented |
UD0235 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,823 | $2,986 | Not Implemented |
UD0234 # 02 Y:1987 | 02 | 1987 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,021 | $0 | Implemented |
UD0236 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,089 | $2,400 | Not Implemented |