Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
309
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0845 # 03 Y:2011 | 03 | 2011 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,285 | $4,000 | Implemented |
UD0845 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,244 | $500 | Not Implemented |
UD0845 # 05 Y:2011 | 05 | 2011 | REDUCE HEAT GAIN BY WINDOW TINTING | $533 | $0 | Not Implemented |
UD0845 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $0 | Implemented |
UD0845 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $286 | $1,500 | Not Implemented |
UD0844 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,542 | $0 | Not Implemented |
UD0844 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,988 | $5,000 | Not Implemented |
UD0844 # 11 Y:2011 | 11 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,123 | $1,000 | Implemented |
UD0844 # 13 Y:2011 | 13 | 2011 | USE OPTIMUM TEMPERATURE | $3,225 | $0 | Not Implemented |
UD0844 # 01 Y:2011 | 01 | 2011 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $170,257 | $280,000 | Not Implemented |
UD0844 # 15 Y:2011 | 15 | 2011 | REDUCE VENTILATION AIR | $17,779 | $0 | Not Implemented |
UD0844 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,616 | $500 | Not Implemented |
UD0844 # 14 Y:2011 | 14 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,762 | $0 | Implemented |
UD0844 # 02 Y:2011 | 02 | 2011 | USE REACTIVE RINSING | $70,989 | $30,000 | Not Implemented |
UD0844 # 12 Y:2011 | 12 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,508 | $16,000 | Not Implemented |
UD0844 # 04 Y:2011 | 04 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $33,247 | $2,000 | Not Implemented |
UD0844 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $11,543 | $16,000 | Not Implemented |
UD0844 # 06 Y:2011 | 06 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $20,051 | $18,555 | Not Implemented |
UD0844 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $267 | $0 | Implemented |
UD0844 # 05 Y:2011 | 05 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,557 | $0 | Implemented |
UD0843 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $509 | $0 | Implemented |
UD0843 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,854 | $0 | Implemented |
UD0843 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $143 | $407 | Not Implemented |
UD0843 # 04 Y:2011 | 04 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,904 | $5,808 | Not Implemented |
UD0843 # 07 Y:2011 | 07 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,212 | $5,000 | Not Implemented |