IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0333 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,336 $0 Implemented
OK0333 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $448 $0 Implemented
OK0333 # 03 Y:1991 03 1991 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,653 $1,800 Implemented
OK0333 # 04 Y:1991 04 1991 USE OPTIMUM THICKNESS INSULATION $4,914 $9,600 Implemented
OK0333 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $0 Implemented
OK0333 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $65 Implemented
OK0333 # 07 Y:1991 07 1991 INSULATE FEEDWATER TANK $41 $66 Implemented
OK0333 # 08 Y:1991 08 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $197 $410 Implemented
OK0333 # 09 Y:1991 09 1991 INSTALL TIMERS AND/OR THERMOSTATS $574 $1,050 Implemented
OK0324 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,113 $0 Implemented
OK0324 # 02 Y:1990 02 1990 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $324 $0 Implemented
OK0324 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,971 $4,800 Not Implemented
OK0324 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $2,799 $10,000 Not Implemented
OK0324 # 05 Y:1990 05 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,755 $32,000 Not Implemented
OK0324 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $846 $1,050 Implemented
OK0318 # 01 Y:1990 01 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,141 $49,497 Implemented
OK0318 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,252 $8,724 Implemented
OK0318 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,228 $245 Implemented
OK0318 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,868 $981 Implemented
OK0318 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $2,067 $1,265 Implemented
OK0318 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $286 $450 Implemented
OK0318 # 07 Y:1990 07 1990 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $232,376 $678,000 Not Implemented
OK0295 # 01 Y:1989 01 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,916 $54,162 Implemented
OK0295 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,139 $4,563 Implemented
OK0295 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,641 $11,362 Implemented