Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1991 |
Principal Product | PRE-STRESSED CONCRETE |
NAICS | n/a |
SIC | 3272 - Concrete Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 110 Thousand Feet |
Production Hrs. Annual | 0 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $42,419 | 640,094 | kWh | $0.07 |
Natural Gas | $23,738 | 7,919 | MMBtu | $3.00 |
Fuel Oil #2 | $4,500 | 658 | MMBtu | $6.84 |
TOTAL ENERGY COSTS | $70,657 | |||
RECOMMENDED SAVINGS* | $15,608 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,608 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $7,336 Cost: - |
$7,336 | - | - | - | - | - | - | - |
$7,336 - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $448 Cost: - |
$448 | 8,206 | - | - | - | - | - | - |
$448 8,206 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $1,653 Cost: $1,800 |
$(-1,637) | (-29,894) | - | - | $3,150 | 490 | $140 | - |
$(-1,637) (-29,894) kWh |
- - MMBtu |
$3,150 490 MMBtu |
$140 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $4,914 Cost: $9,600 |
- | - | $4,914 | 1,639 | - | - | - | - |
- - kWh |
$4,914 1,639 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $328 Cost: - |
$307 | 5,569 | - | - | - | - | $21 | - |
$307 5,569 kWh |
- - MMBtu |
- - MMBtu |
$21 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $117 Cost: $65 |
$117 | 2,052 | - | - | - | - | - | - |
$117 2,052 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2123 INSULATE FEEDWATER TANK |
Savings: $41 Cost: $66 |
- | - | $41 | 14 | - | - | - | - |
- - kWh |
$41 14 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $197 Cost: $410 |
- | - | $197 | 66 | - | - | - | - |
- - kWh |
$197 66 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $574 Cost: $1,050 |
- | - | $574 | 191 | - | - | - | - |
- - kWh |
$574 191 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,608 Cost: $12,991 |
$6,571 | (-14,067) | $5,726 | 1,910 | $3,150 | 490 | $161 | - | $6,571 (-14,067) kWh |
$5,726 1,910 MMBtu |
$3,150 490 MMBtu |
$161 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,608 Cost: $12,991 |
$6,571 | (-14,067) | $5,726 | 1,910 | $3,150 | 490 | $161 | - | $6,571 (-14,067) kWh |
$5,726 1,910 MMBtu |
$3,150 490 MMBtu |
$161 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes |