IAC Assessment: OK0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product PRE-STRESSED CONCRETE
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 110 Thousand Feet
Production Hrs. Annual 0
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,419 640,094 kWh $0.07
Natural Gas $23,738 7,919 MMBtu $3.00
Fuel Oil #2 $4,500 658 MMBtu $6.84
TOTAL ENERGY COSTS $70,657
RECOMMENDED SAVINGS* $15,608 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,608
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,336
Cost:
-
$7,336 - - - - - - - $7,336
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$448
Cost:
-
$448 8,206 - - - - - - $448
8,206
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$1,653
Cost:
$1,800
$(-1,637) (-29,894) - - $3,150 490 $140 - $(-1,637)
(-29,894)
kWh
-
-
MMBtu
$3,150
490
MMBtu
$140
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$4,914
Cost:
$9,600
- - $4,914 1,639 - - - - -
-
kWh
$4,914
1,639
MMBtu
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$328
Cost:
-
$307 5,569 - - - - $21 - $307
5,569
kWh
-
-
MMBtu
-
-
MMBtu
$21
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$117
Cost:
$65
$117 2,052 - - - - - - $117
2,052
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.2123 INSULATE FEEDWATER TANK Savings:
$41
Cost:
$66
- - $41 14 - - - - -
-
kWh
$41
14
MMBtu
-
-
MMBtu
-
-
$
08: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$197
Cost:
$410
- - $197 66 - - - - -
-
kWh
$197
66
MMBtu
-
-
MMBtu
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$574
Cost:
$1,050
- - $574 191 - - - - -
-
kWh
$574
191
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$15,608
Cost:
$12,991
$6,571 (-14,067) $5,726 1,910 $3,150 490 $161 - $6,571
(-14,067)
kWh
$5,726
1,910
MMBtu
$3,150
490
MMBtu
$161
-
$
TOTAL IMPLEMENTED Savings:
$15,608
Cost:
$12,991
$6,571 (-14,067) $5,726 1,910 $3,150 490 $161 - $6,571
(-14,067)
kWh
$5,726
1,910
MMBtu
$3,150
490
MMBtu
$161
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes