IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0771 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,125 $3,460 Not Implemented
OK0771 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $284 $1,213 Not Implemented
OK0771 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,458 $0 Not Implemented
OK0771 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $2,875 Not Implemented
OK0771 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,066 $0 Not Implemented
OK0771 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,463 $846 Not Implemented
OK0771 # 07 Y:2008 07 2008 $2,068 $200 Not Implemented
OK0769 # 07 Y:2008 07 2008 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $451,827 $2,500,000 Not Implemented
OK0769 # 06 Y:2008 06 2008 $2,068 $200 Not Implemented
OK0769 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,911 $4,475 Implemented
OK0769 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98,641 $246,228 Not Implemented
OK0769 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $1,922 Implemented
OK0769 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $53,558 $2,347 Not Implemented
OK0769 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $18,368 $731 Not Implemented
OK0766 # 01 Y:2008 01 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,948 $775 Implemented
OK0766 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,063 $0 Implemented
OK0766 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $1,937 Implemented
OK0766 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,350 $11,729 Not Implemented
OK0766 # 05 Y:2008 05 2008 Install Anaerobic Digester $304,567 $240,000 Not Implemented
OK0765 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $0 Implemented
OK0765 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,974 $18,623 Implemented
OK0765 # 06 Y:2008 06 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $42,105 $161,000 Implemented
OK0765 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,176 $4,690 Not Implemented
OK0765 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $1,794 $2,151 Not Implemented
OK0765 # 03 Y:2008 03 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,600 $0 Not Implemented