Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0976 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,681 $35,200 Not Implemented
OK0976 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,185 $3,480 Not Implemented
OK0976 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,176 $61,707 Implemented
OK0976 # 01 Y:2017 01 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,812 $180,000 Implemented
OK0976 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,586 $3,840 Implemented
OK0967 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,739 $2,695 Not Implemented
OK0967 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,380 $6,786 Not Implemented
OK0967 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,303 $7,634 Not Implemented
OK0967 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $776 $2,508 Not Implemented
OK0967 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,932 $35,800 Not Implemented
OK0967 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,854 $3,960 Not Implemented
OK0967 # 07 Y:2017 07 2017 INSTALL SET-BACK TIMERS $1,719 $1,020 Not Implemented
OK0967 # 08 Y:2017 08 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $687 $2,800 Not Implemented
OK0967 # 09 Y:2017 09 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,124 $30,000 Not Implemented
OK0971 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $199 $468 Not Implemented
OK0971 # 07 Y:2017 07 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,676 $0 Not Implemented
OK0971 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,570 $10,263 Implemented
OK0971 # 09 Y:2017 09 2017 INSTALL SET-BACK TIMERS $977 $1,306 Implemented
OK0971 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,220 $14,212 Not Implemented
OK0971 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,254 $39,396 Implemented
OK0971 # 08 Y:2017 08 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,433 $1,608 Not Implemented
OK0971 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $19,022 $4,357 Not Implemented
OK0971 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $654 $1,913 Not Implemented
OK0970 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,299 $1,252 Not Implemented
OK0970 # 08 Y:2017 08 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,475 $7,530 Not Implemented