IAC logo
IAC Assessment: OK0971
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0971
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product Foundation repair
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 58,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,584 1,366,886 kWh $0.12
Electricity Demand $73,276 10,468 kW-months/year $7.00
Natural Gas $58,921 22,262 MMBtu $2.65
TOTAL ENERGY COSTS $290,781
RECOMMENDED SAVINGS* $57,005 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,801
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,220
Cost:
$14,212
$2,380 20,521 $840 120 - - - - $2,380
20,521
kWh
$840
120
kW-months/year
-
-
$
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$654
Cost:
$1,913
- - - - - - $654 247 -
-
kWh
-
-
kW-months/year
-
-
$
$654
247
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$199
Cost:
$468
$199 1,721 - - - - - - $199
1,721
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,254
Cost:
$39,396
$8,154 70,289 $2,100 300 - - - - $8,154
70,289
kWh
$2,100
300
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,570
Cost:
$10,263
$3,632 31,320 $938 134 - - - - $3,632
31,320
kWh
$938
134
kW-months/year
-
-
$
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,022
Cost:
$4,357
- - - - $19,022 - - - -
-
kWh
-
-
kW-months/year
$19,022
-
$
-
-
MMBtu
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$15,676
Cost:
-
- - - - $15,676 - - - -
-
kWh
-
-
kW-months/year
$15,676
-
$
-
-
MMBtu
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,433
Cost:
$1,608
- - - - - - $2,433 919 -
-
kWh
-
-
kW-months/year
-
-
$
$2,433
919
MMBtu
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$977
Cost:
$1,306
$458 3,947 - - - - $519 196 $458
3,947
kWh
-
-
kW-months/year
-
-
$
$519
196
MMBtu
TOTAL RECOMMENDED Savings:
$57,005
Cost:
$73,523
$14,823 127,798 $3,878 554 $34,698 - $3,606 1,362 $14,823
127,798
kWh
$3,878
554
kW-months/year
$34,698
-
$
$3,606
1,362
MMBtu
TOTAL IMPLEMENTED Savings:
$15,801
Cost:
$50,965
$12,244 105,556 $3,038 434 - - $519 196 $12,244
105,556
kWh
$3,038
434
kW-months/year
-
-
$
$519
196
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas