IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0451 # 06 Y:2018 06 2018 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $18,094 $32,500 Not Implemented
LE0451 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,386 $7,000 Not Implemented
LE0451 # 04 Y:2018 04 2018 RECOVER WASTE HEAT FROM EQUIPMENT $4,124 $4,000 Not Implemented
LE0451 # 08 Y:2018 08 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,589 $53,000 Implemented
LE0423 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,184 $25 Not Implemented
LE0423 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,325 $18,675 Not Implemented
LE0423 # 09 Y:2016 09 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,028 $24,500 Not Implemented
LE0423 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $1,518 $6,016 Not Implemented
LE0423 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $961 $2,575 Not Implemented
LE0423 # 06 Y:2016 06 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $928 $2,300 Not Implemented
LE0423 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,541 $1,200 Not Implemented
LE0423 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $3,716 $725 Not Implemented
LE0423 # 02 Y:2016 02 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,422 $50 Not Implemented
LE0423 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,470 $25 Not Implemented
LE0418 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,905 $12,000 Implemented
LE0418 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $317,839 $125,000 Implemented
LE0418 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,481 $15,000 Not Implemented
LE0418 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,199 $0 Implemented
LE0418 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,759 $6,000 Implemented
LE0418 # 05 Y:2016 05 2016 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,116,268 $1,540,000 Implemented
LE0418 # 09 Y:2016 09 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $26,015 $127,400 Implemented
LE0418 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,764 $11,250 Not Implemented
LE0418 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,745 $13,000 Not Implemented
LE0395 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,025 $41,790 Not Implemented
LE0395 # 13 Y:2015 13 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,525 $1,500 Not Implemented