IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

620

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0513 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $1,500 Not Implemented
LE0513 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,214 $1,500 Not Implemented
LE0506 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,556 $11,500 Not Implemented
LE0506 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,000 Not Implemented
LE0506 # 04 Y:2021 04 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,239 $800,000 Not Implemented
LE0506 # 03 Y:2021 03 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $36,412 $80,000 Not Implemented
DL0188 # 10 Y:2021 10 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,490 $25,000 Implemented
DL0188 # 12 Y:2021 12 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,290 $57,350 Implemented
DL0188 # 11 Y:2021 11 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,150 $4,600 Not Implemented
DL0188 # 13 Y:2021 13 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,000 $5,500 Not Implemented
DL0188 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $900 $0 Implemented
DL0188 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $860 $81,000 Implemented
DL0188 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,340 $48,750 Not Implemented
DL0188 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,987 $20,000 Not Implemented
DL0188 # 02 Y:2021 02 2021 METER WASTE WATER $172,100 $3,000 Not Implemented
DL0188 # 03 Y:2021 03 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,050 $9,490 Implemented
DL0188 # 05 Y:2021 05 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,798 $1,000 Implemented
DL0188 # 14 Y:2021 14 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,800 $9,120 Not Implemented
DL0188 # 09 Y:2021 09 2021 RECOVER WASTE HEAT FROM EQUIPMENT $7,620 $7,000 Not Implemented
DL0188 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,320 $8,000 Not Implemented
DL0187 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,370 $6,500 Not Implemented
DL0187 # 09 Y:2021 09 2021 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $797 $4,000 Not Implemented
DL0187 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,324 $119,348 Not Implemented
DL0187 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,153 $1,574 Implemented
DL0187 # 02 Y:2021 02 2021 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $13,620 $0 Implemented