IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0098 # 07 Y:1996 07 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,988 $10,000 Not Implemented
WV0098 # 06 Y:1996 06 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $240,100 $11,700 Implemented
WV0098 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $180 $520 Implemented
WV0098 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,197 $224 Not Implemented
WV0098 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,954 $1,800 Implemented
WV0098 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,473 $6,759 Implemented
WV0098 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,489 $2,245 Implemented
WV0089 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $167 $36 Implemented
WV0089 # 09 Y:1996 09 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,728 $0 Implemented
WV0089 # 08 Y:1996 08 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,810 $10,600 Not Implemented
WV0089 # 07 Y:1996 07 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,478 $2,800 Not Implemented
WV0089 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $399 $478 Not Implemented
WV0089 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $400 Implemented
WV0089 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $441 Not Implemented
WV0089 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $527 $280 Implemented
WV0089 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $988 $230 Implemented
WV0087 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,024 $1,580 Implemented
WV0087 # 08 Y:1996 08 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $82,766 $960 Not Implemented
WV0087 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $7,466 $1,085 Implemented
WV0087 # 06 Y:1996 06 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,158 $12,000 Not Implemented
WV0087 # 05 Y:1996 05 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,071 $1,467 Not Implemented
WV0087 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $825 $300 Implemented
WV0087 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $195 $320 Not Implemented
WV0087 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $327 $160 Implemented