IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0285 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,391 $50 Implemented
LE0285 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,792 $800 Not Implemented
LE0285 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,666 $200 Not Implemented
LE0285 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $12,507 $5,000 Not Implemented
LE0285 # 01 Y:2009 01 2009 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $146,916 $900,000 Not Implemented
LE0285 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,999 $12,000 Not Implemented
SU0221 # 06 Y:2005 06 2005 INSTALL TURBULATORS $1,056 $271 Not Implemented
SU0221 # 10 Y:2005 10 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $259 $721 Implemented
SU0221 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $96 $391 Implemented
SU0221 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,388 $2,015 Implemented
SU0221 # 08 Y:2005 08 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,125 $5,000 Not Implemented
SU0221 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,835 $444 Not Implemented
SU0221 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129 $1,155 Implemented
SU0221 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,043 $0 Implemented
SU0221 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,455 $0 Implemented
SU0221 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 Implemented
SU0221 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $1,767 $0 Implemented
LE0108 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $500 Implemented
LE0108 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,746 $2,500 Not Implemented
LE0108 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,248 $0 Implemented
LE0108 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,738 $3,120 Implemented
HO0236 # 09 Y:2000 09 2000 $1,160 $335 n/a
HO0236 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $15 n/a
HO0236 # 12 Y:2000 12 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $175 $500 n/a
HO0236 # 11 Y:2000 11 2000 METER WASTE WATER $1,000 $250 n/a