Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
255
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0125 # 07 Y:2001 | 07 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,370 | $0 | Implemented |
LE0125 # 02 Y:2001 | 02 | 2001 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,926 | $0 | Implemented |
LE0125 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,045 | $0 | Not Implemented |
LE0125 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,715 | $2,500 | Not Implemented |
LE0125 # 05 Y:2001 | 05 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $466 | $0 | Implemented |
LE0125 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,470 | $0 | Not Implemented |
LE0125 # 03 Y:2001 | 03 | 2001 | IMPROVE LUBRICATION PRACTICES | $1,126 | $400 | Not Implemented |
LE0121 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,570 | $2,500 | Implemented |
LE0121 # 02 Y:2001 | 02 | 2001 | INSULATE FEEDWATER TANK | $498 | $260 | Implemented |
LE0121 # 04 Y:2001 | 04 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,010 | $1,280 | Not Implemented |
LE0121 # 05 Y:2001 | 05 | 2001 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $14,087 | $1,500 | Not Implemented |
LE0121 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $756 | $1,000 | Implemented |
LE0121 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,495 | $0 | Implemented |
LE0119 # 05 Y:2001 | 05 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $17,872 | $18,500 | Implemented |
LE0119 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,434 | $0 | Implemented |
LE0119 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $1,497 | $1,250 | Not Implemented |
LE0119 # 04 Y:2001 | 04 | 2001 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $19,921 | $1,000 | Implemented |
LE0119 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,354 | $1,920 | Implemented |
WV0223 # 07 Y:2001 | 07 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $13,680 | $220 | Implemented |
WV0223 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,630 | $386 | Not Implemented |
WV0223 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,270 | $124 | Implemented |
WV0223 # 09 Y:2001 | 09 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $216,000 | $400,000 | Not Implemented |
WV0223 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,567 | $44 | Implemented |
WV0223 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,194 | $1,000 | Not Implemented |
WV0223 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,635 | $1,344 | Implemented |