IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0446 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,351 $6,525 Implemented
LE0446 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $89,899 $25,000 Implemented
LE0446 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,447 $1,000 Not Implemented
LE0446 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $22,087 $5,000 Implemented
LE0446 # 08 Y:2017 08 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $1,500 Implemented
LE0446 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $2,033 $30 Implemented
LE0446 # 01 Y:2017 01 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,142 $30 Not Implemented
LE0446 # 04 Y:2017 04 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $9,554 $500 Not Implemented
LE0446 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,120 $29,145 Implemented
LE0446 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $672 $30 Implemented
LE0445 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $6,692 Implemented
LE0445 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $750 Implemented
LE0445 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,590 $1,500 Implemented
LE0445 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,107 $1,000 Implemented
LE0445 # 03 Y:2017 03 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,163 $3,000 Not Implemented
LE0444 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $158 $80 Not Implemented
LE0444 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,628 $5,580 Implemented
LE0444 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $31,107 $30 Implemented
LE0444 # 05 Y:2017 05 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $110,990 $170,000 Implemented
LE0444 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $917 $30 Implemented
LE0444 # 07 Y:2017 07 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,995 $122,160 Not Implemented
LE0444 # 10 Y:2017 10 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,541 $6,960 Implemented
LE0444 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,646 $1,000 Not Implemented
LE0444 # 09 Y:2017 09 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,905 $38,160 Not Implemented
LE0444 # 11 Y:2017 11 2017 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $233,480 $1,905,000 Implemented