IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0302 # 10 Y:2016 10 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $521 $116 Not Implemented
MI0302 # 09 Y:2016 09 2016 AIR CONDITION ONLY SPACE NECESSARY $1,008 $160 Implemented
MI0302 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,335 $416 Implemented
MI0302 # 07 Y:2016 07 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,023 $3,200 Not Implemented
MI0302 # 06 Y:2016 06 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,171 $260 Not Implemented
MI0302 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,711 $2,387 Implemented
MI0302 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,652 $4,744 Implemented
MI0302 # 03 Y:2016 03 2016 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,045 $11,648 Not Implemented
MI0302 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,840 $940 Implemented
MI0302 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,170 $29,740 Implemented
MI0300 # 14 Y:2016 14 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,797 $2,520 Implemented
MI0300 # 16 Y:2016 16 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $849 $29 Implemented
MI0300 # 15 Y:2016 15 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,584 $5,100 Not Implemented
MI0300 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $98,547 $35,359 Not Implemented
MI0300 # 13 Y:2016 13 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,924 $40 Implemented
MI0300 # 12 Y:2016 12 2016 USE OPTIMUM THICKNESS INSULATION $6,276 $1,644 Not Implemented
MI0300 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $7,917 $1,281 Implemented
MI0300 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,807 $22,446 Implemented
MI0300 # 09 Y:2016 09 2016 UPGRADE OBSOLETE EQUIPMENT $15,163 $4,691 Not Implemented
MI0300 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,521 $1,660 Implemented
MI0300 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,599 $40 Implemented
MI0300 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $37,529 $0 Implemented
MI0300 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $47,043 $12,140 Implemented
MI0300 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $68,863 $173 Implemented
MI0300 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $75,921 $15,156 Not Implemented