IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0501 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,070 $81,700 Not Implemented
GT0501 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,480 $0 Not Implemented
GT0501 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,710 $65,530 Implemented
GT0501 # 06 Y:1993 06 1993 UPGRADE CONTROLS ON COMPRESSORS $21,170 $30,000 Implemented
GT0501 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,500 $3,500 Implemented
GT0501 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $54,440 $20,000 Not Implemented
GT0501 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,930 $115,900 Implemented
GT0501 # 01 Y:1993 01 1993 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,620 $10,000 Implemented
GT0501 # 02 Y:1993 02 1993 REDUCE EXCESSIVE BOILER BLOWDOWN $1,760 $0 Not Implemented
GT0503 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,350 $76,040 Not Implemented
GT0503 # 01 Y:1993 01 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,070 $144,720 Not Implemented
GT0503 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,830 $51,700 Not Implemented
GT0503 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,260 $0 Not Implemented
GT0503 # 04 Y:1993 04 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,700 $3,090 Implemented
GT0503 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $780 $450 Implemented
GT0503 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,340 $0 Not Implemented
GT0502 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,020 $1,280 Implemented
GT0502 # 01 Y:1993 01 1993 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $10,870 $13,500 Implemented
GT0502 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,360 $11,160 Not Implemented
GT0502 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,010 $1,119,000 Not Implemented
GT0502 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,290 $0 Not Implemented
GT0502 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,230 $30,840 Implemented
GT0502 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,790 $4,600 Not Implemented
GT0498 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,655 $37,220 Implemented
GT0498 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,000 $116,200 Implemented