IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0458 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,853 $3,390 Not Implemented
TN0458 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,619 $570 Not Implemented
TN0458 # 01 Y:1992 01 1992 OPERATE BOILERS ON HIGH FIRE SETTING $4,410 $15,000 Not Implemented
TN0450 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,646 $860 Implemented
TN0450 # 02 Y:1992 02 1992 IMPROVE LUBRICATION PRACTICES $788 $300 Implemented
TN0450 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $316 Implemented
TN0450 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $706 $890 Implemented
TN0450 # 05 Y:1992 05 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,058 $0 Implemented
TN0450 # 06 Y:1992 06 1992 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Implemented
TN0422 # 01 Y:1991 01 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $49,720 $23,800 Implemented
TN0422 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,233 $3,380 Implemented
TN0422 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,615 $3,600 Implemented
TN0422 # 04 Y:1991 04 1991 KEEP LAMPS AND REFLECTORS CLEAN $5,413 $0 Implemented
TN0422 # 05 Y:1991 05 1991 USE COMPRESSOR AIR FILTERS $4,744 $25 Implemented
TN0422 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,798 $1,130 Implemented
TN0422 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,708 $345 Implemented
TN0422 # 08 Y:1991 08 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,563 $1,200 Implemented
TN0422 # 09 Y:1991 09 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,186 $0 Implemented
TN0422 # 10 Y:1991 10 1991 INSTALL SET-BACK TIMERS $408 $0 Implemented
TN0422 # 11 Y:1991 11 1991 DISCONNECT BALLASTS $170 $368 Implemented
TN0368 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,877 $0 Not Implemented
TN0368 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,310 $2,994 Not Implemented
TN0368 # 03 Y:1989 03 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,212 $7,800 Not Implemented
TN0368 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,470 $1,190 Not Implemented
TN0368 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,946 $1,470 Not Implemented