IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0456 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $15 Not Implemented
AM0456 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $790 $230 Not Implemented
KG0027 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,917 $15,175 Implemented
KG0027 # 04 Y:1995 04 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,749 $900 Not Implemented
KG0027 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,037 $6,665 Implemented
KG0027 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,341 $4,000 Implemented
KG0010 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $139 $390 Not Implemented
KG0010 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $657 $2,500 Implemented
KG0010 # 04 Y:1994 04 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $695 $2,785 Not Implemented
KG0010 # 03 Y:1994 03 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,603 $1,050 Implemented
KG0010 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,359 $48,100 Implemented
KG0010 # 02 Y:1994 02 1994 USE POWER DURING OFF-PEAK PERIODS $21,337 $1,260 Not Implemented
AM0141 # 09 Y:1992 09 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $730 $4,800 Implemented
AM0141 # 10 Y:1992 10 1992 INSTALL SET-BACK TIMERS $500 $400 Not Implemented
AM0141 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,820 $3,500 Not Implemented
AM0141 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,433 $3,150 Implemented
AM0141 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,370 $325 Implemented
AM0141 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $4,360 $200 Not Implemented
AM0141 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,970 $500 Implemented
AM0141 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $11,940 Not Implemented
AM0141 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $7,250 $1,670 Implemented
AM0141 # 01 Y:1992 01 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $13,280 $6,775 Implemented