IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,154

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0363 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $201 $167 Not Implemented
OK0363 # 06 Y:1992 06 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,230 $0 Not Implemented
AM0108 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,366 $0 Implemented
AM0108 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,700 $12,000 Implemented
AM0108 # 03 Y:1991 03 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,750 $0 Implemented
AM0108 # 04 Y:1991 04 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $1,400 $103 Implemented
AM0108 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $60 Implemented
AM0108 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $235 $181 Implemented
AM0108 # 07 Y:1991 07 1991 INSULATE BARE EQUIPMENT $96 $426 Implemented
AM0100 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $60 Not Implemented
AM0100 # 02 Y:1990 02 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $232 $900 Not Implemented
AM0100 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $187 Implemented
AM0100 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $105 $80 Not Implemented
AM0100 # 05 Y:1990 05 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $76 $69 Not Implemented
AM0100 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $67 $0 Not Implemented
AM0100 # 07 Y:1990 07 1990 RECOVER WASTE HEAT FROM EQUIPMENT $38 $194 Not Implemented
AM0100 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $33 $33 Implemented
AM0088 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,652 $1,920 Not Implemented
AM0088 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $869 $520 Not Implemented
AM0088 # 03 Y:1990 03 1990 IMPROVE LUBRICATION PRACTICES $926 $0 Not Implemented
AM0088 # 04 Y:1990 04 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $319 $1,530 Not Implemented
AM0088 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $348 $54 Not Implemented
AM0088 # 06 Y:1990 06 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $305 $165 Not Implemented
AM0088 # 07 Y:1990 07 1990 PAY UTILITY BILLS ON TIME $123 $0 Implemented
AM0086 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,920 $50,000 Implemented