Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
218
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0075 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,895 | $270 | Implemented |
AM0075 # 09 Y:1989 | 09 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $640 | $1,300 | Implemented |
AM0075 # 05 Y:1989 | 05 | 1989 | INSULATE BARE EQUIPMENT | $2,845 | $2,500 | Not Implemented |
AM0075 # 03 Y:1989 | 03 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,340 | $16,650 | Not Implemented |
AM0075 # 08 Y:1989 | 08 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $146 | $135 | Not Implemented |
AM0075 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,222 | $1,200 | Implemented |
AM0075 # 07 Y:1989 | 07 | 1989 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,085 | $1,500 | Implemented |
AM0075 # 04 Y:1989 | 04 | 1989 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,597 | $1,000 | Not Implemented |
AM0075 # 01 Y:1989 | 01 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,170 | $28,650 | Not Implemented |
AM0074 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,280 | $1,400 | Implemented |
AM0074 # 03 Y:1989 | 03 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,840 | $0 | Implemented |
AM0074 # 06 Y:1989 | 06 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,580 | $1,000 | Implemented |
AM0074 # 04 Y:1989 | 04 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,600 | $2,500 | Implemented |
AM0074 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,850 | $2,800 | Implemented |
AM0074 # 07 Y:1989 | 07 | 1989 | INSULATE BARE EQUIPMENT | $665 | $270 | Implemented |
AM0074 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,360 | $660 | Implemented |
AM0073 # 03 Y:1989 | 03 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,245 | $1,100 | Not Implemented |
AM0073 # 01 Y:1989 | 01 | 1989 | OPTIMIZE PLANT POWER FACTOR | $7,510 | $0 | Implemented |
AM0073 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $703 | $500 | Implemented |
AM0073 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,170 | $3,600 | Implemented |
AM0072 # 02 Y:1989 | 02 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,470 | $24,000 | Not Implemented |
AM0073 # 05 Y:1989 | 05 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $514 | $0 | Not Implemented |
AM0073 # 06 Y:1989 | 06 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $260 | $300 | Not Implemented |
AM0072 # 03 Y:1989 | 03 | 1989 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $9,950 | $56,300 | Not Implemented |
AM0072 # 09 Y:1989 | 09 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $680 | $0 | Not Implemented |