IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0075 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,895 $270 Implemented
AM0075 # 09 Y:1989 09 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $640 $1,300 Implemented
AM0075 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $2,845 $2,500 Not Implemented
AM0075 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,340 $16,650 Not Implemented
AM0075 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $135 Not Implemented
AM0075 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,222 $1,200 Implemented
AM0075 # 07 Y:1989 07 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,085 $1,500 Implemented
AM0075 # 04 Y:1989 04 1989 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,597 $1,000 Not Implemented
AM0075 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,170 $28,650 Not Implemented
AM0074 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,280 $1,400 Implemented
AM0074 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,840 $0 Implemented
AM0074 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,580 $1,000 Implemented
AM0074 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,600 $2,500 Implemented
AM0074 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,850 $2,800 Implemented
AM0074 # 07 Y:1989 07 1989 INSULATE BARE EQUIPMENT $665 $270 Implemented
AM0074 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,360 $660 Implemented
AM0073 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,245 $1,100 Not Implemented
AM0073 # 01 Y:1989 01 1989 OPTIMIZE PLANT POWER FACTOR $7,510 $0 Implemented
AM0073 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $500 Implemented
AM0073 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $3,600 Implemented
AM0072 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,470 $24,000 Not Implemented
AM0073 # 05 Y:1989 05 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $514 $0 Not Implemented
AM0073 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $260 $300 Not Implemented
AM0072 # 03 Y:1989 03 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,950 $56,300 Not Implemented
AM0072 # 09 Y:1989 09 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $680 $0 Not Implemented