IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0165 # 04 Y:1992 04 1992 REDUCE FLUID FLOW RATES $2,710 $0 Not Implemented
AM0165 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,750 $0 Not Implemented
AM0165 # 01 Y:1992 01 1992 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,570 $1,350 Implemented
AM0165 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,915 $3,450 Not Implemented
AM0165 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $2,520 Implemented
AM0165 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $150 $190 Implemented
AM0165 # 07 Y:1992 07 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $920 $920 Not Implemented
AM0165 # 02 Y:1992 02 1992 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,300 $3,630 Implemented
AM0163 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $330 $0 Implemented
AM0164 # 05 Y:1992 05 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,200 $419 Not Implemented
AM0163 # 04 Y:1992 04 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $620 $270 Not Implemented
AM0163 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $2,440 $1,240 Implemented
AM0164 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $1,030 Implemented
AM0164 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $93,089 $0 Implemented
AM0164 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,140 $910 Implemented
AM0163 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $18,300 $35,000 Implemented
AM0163 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,420 $1,360 Not Implemented
AM0164 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $44,815 $64,750 Implemented
AM0164 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $19,440 $850 Not Implemented
AM0161 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $630 Implemented
AM0161 # 08 Y:1992 08 1992 INSTALL TIMERS AND/OR THERMOSTATS $280 $450 Implemented
AM0161 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,855 $0 Implemented
AM0161 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,290 $985 Implemented
AM0161 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $690 $0 Implemented
AM0161 # 05 Y:1992 05 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,420 $0 Implemented