Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
406
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0090 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $120 | Implemented |
TA0090 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $23,490 | $45,000 | Not Implemented |
TA0090 # 05 Y:2004 | 05 | 2004 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,920 | $120 | Not Implemented |
TA0090 # 04 Y:2004 | 04 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $2,350 | $0 | Not Implemented |
TA0090 # 01 Y:2004 | 01 | 2004 | CONDENSE OPERATION INTO ONE BUILDING | $91,320 | $20,000 | Not Implemented |
TA0090 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $8 | Not Implemented |
TA0090 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $42,810 | $64,000 | Not Implemented |
AM0475 # 12 Y:2004 | 12 | 2004 | INSULATE BARE EQUIPMENT | $450 | $60 | Not Implemented |
AM0475 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,740 | $425 | Implemented |
AM0475 # 04 Y:2004 | 04 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,170 | $4,600 | Not Implemented |
AM0475 # 11 Y:2004 | 11 | 2004 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $572 | $699 | Not Implemented |
AM0475 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,390 | $500 | Implemented |
AM0475 # 07 Y:2004 | 07 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,290 | $400 | Not Implemented |
AM0475 # 09 Y:2004 | 09 | 2004 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,600 | $12,500 | Not Implemented |
AM0475 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,100 | $300 | Implemented |
AM0475 # 01 Y:2004 | 01 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $19,000 | $650 | Implemented |
AM0475 # 08 Y:2004 | 08 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,490 | $900 | Implemented |
AM0475 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,020 | $33 | Implemented |
AM0475 # 02 Y:2004 | 02 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $5,800 | $700 | Implemented |
LL0212 # 07 Y:2004 | 07 | 2004 | USE PHOTOCELL CONTROLS | $821 | $120 | Implemented |
LL0212 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $834 | $264 | Implemented |
LL0212 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,438 | $15,562 | Implemented |
LL0212 # 05 Y:2004 | 05 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,394 | $250 | Not Implemented |
LL0212 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,474 | $4,400 | Implemented |
LL0212 # 10 Y:2004 | 10 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,600 | $840 | Not Implemented |