IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0436 # 10 Y:2011 10 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,000 $10,000 Not Implemented
NC0436 # 09 Y:2011 09 2011 COVER OPEN TANKS $1,610 $5,000 Not Implemented
NC0436 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,009 $1,000 Implemented
NC0436 # 07 Y:2011 07 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,967 $27,000 Not Implemented
NC0436 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $12,954 $6,435 Implemented
NC0436 # 05 Y:2011 05 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,955 $11,000 Not Implemented
NC0436 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,560 $100 Implemented
NC0436 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,076 $4,000 Implemented
NC0436 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,241 $21,888 Not Implemented
NC0436 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107,275 $300,044 Not Implemented
NC0433 # 06 Y:2011 06 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,685 $29,025 Not Implemented
NC0433 # 08 Y:2011 08 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $276 $0 Not Implemented
NC0433 # 07 Y:2011 07 2011 DEVELOP A REPAIR/REPLACE POLICY $2,159 $3,999 Implemented
NC0433 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,334 $100 Implemented
NC0433 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,299 $50 Implemented
NC0433 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,463 $10,818 Not Implemented
NC0433 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $1,403 Implemented
NC0433 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $81,541 $230,949 Implemented
WV0437 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,985 $613 Implemented
WV0437 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,803 $1,613 Implemented
WV0437 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,934 $5,194 Implemented
WV0437 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,832 $363 Implemented
WV0437 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $3,937 $18,000 Not Implemented
WV0437 # 09 Y:2011 09 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,451 $4,200 Not Implemented
WV0437 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,791 $69,419 Implemented