Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0665 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,064 | $3,296 | n/a |
WV0665 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,272 | $1,500 | n/a |
WV0665 # 04 Y:2024 | 04 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $7,315 | $22,800 | n/a |
WV0665 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,375 | $13,475 | n/a |
WV0665 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,926 | $238,677 | n/a |
WV0665 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $100,715 | $390,000 | n/a |
WV0665 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $3,763 | $2,971 | n/a |
WV0665 # 08 Y:2024 | 08 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,306 | $1,070 | n/a |
WV0665 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $150 | n/a |
WV0665 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $2,096 | $1,417 | n/a |
WV0665 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,829 | $9,140 | n/a |
WV0665 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $375 | n/a |
DL0239 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,623 | $17,500 | n/a |
DL0239 # 09 Y:2024 | 09 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $44,586 | $1,934 | n/a |
DL0239 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,185 | $51,431 | n/a |
DL0239 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,587 | $28,225 | n/a |
DL0239 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $397,405 | $140,000 | n/a |
DL0239 # 05 Y:2024 | 05 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,543 | $2,247 | n/a |
DL0239 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $61,029 | $10,000 | n/a |
DL0239 # 03 Y:2024 | 03 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $37,050 | $110,000 | n/a |
DL0239 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,306 | $1,250 | n/a |
WV0659 # 05 Y:2024 | 05 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,133 | $19,900 | n/a |
WV0659 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,213 | $1,440 | n/a |
WV0659 # 03 Y:2024 | 03 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $6,267 | $2,720 | n/a |
WV0659 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $17,495 | $16,930 | n/a |