IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0584 # 05 Y:2012 05 2012 MINIMIZE WATER USAGE $4,574 $7,000 Not Implemented
OR0584 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,152 $251,677 Not Implemented
OR0584 # 06 Y:2012 06 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,796 $19,701 Not Implemented
OR0584 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,631 $27,000 Not Implemented
OR0584 # 03 Y:2012 03 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,839 $29,000 Not Implemented
OR0584 # 02 Y:2012 02 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $26,558 $19,925 Not Implemented
OR0584 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,320 $0 Not Implemented
UW0039 # 01 Y:2010 01 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $51,027 $70,000 Not Implemented
UW0039 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,997 $26,825 Not Implemented
UW0039 # 03 Y:2010 03 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $13,491 $20,784 Not Implemented
UW0036 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $1,039 $1,072 Not Implemented
UW0036 # 04 Y:2010 04 2010 $819 $45 Not Implemented
UW0036 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $417 $825 Not Implemented
UW0036 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,120 $1,590 Not Implemented
UW0036 # 01 Y:2010 01 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $30,860 $61,720 Not Implemented
OR0510 # 01 Y:2006 01 2006 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $61,000 $40,000 Implemented
OR0510 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,900 $19,200 Implemented
OR0510 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,000 $11,600 Not Implemented
OR0510 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,200 $35,000 Implemented
OR0510 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $11,250 $13,600 Not Implemented
OR0510 # 05 Y:2006 05 2006 INSTALL SKYLIGHTS $4,750 $12,400 Not Implemented
OR0510 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,480 $5,000 Not Implemented
OR0508 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $3,200 Implemented
OR0508 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,100 $12,000 Implemented
OR0508 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $5,100 $30,000 Implemented