Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2006 |
Principal Product | canned corn |
NAICS | 311421 - Fruit and Vegetable Canning |
SIC | 2033 - Canned Fruits And Vegetables |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 430,000 |
Annual Production | 96,000,000 Pieces |
Production Hrs. Annual | 4,426 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $301,150 | 4,476,660 | kWh | $0.07 |
Natural Gas | $492,170 | 660,083 | MMBtu | $0.75 |
TOTAL ENERGY COSTS | $793,320 | |||
RECOMMENDED SAVINGS* | $110,580 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $78,100 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4152 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT |
Savings: $61,000 Cost: $40,000 |
- | - | - | - | $61,000 | - |
- - kWh |
- - MMBtu |
$61,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $15,000 Cost: $11,600 |
- | - | $15,000 | 2 | - | - |
- - kWh |
$15,000 2 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $12,200 Cost: $35,000 |
- | - | $12,200 | 1,700 | - | - |
- - kWh |
$12,200 1,700 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,250 Cost: $13,600 |
- | - | $11,250 | - | - | - |
- - kWh |
$11,250 - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7145 INSTALL SKYLIGHTS |
Savings: $4,750 Cost: $12,400 |
$4,750 | - | - | - | - | - |
$4,750 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,480 Cost: $5,000 |
$1,480 | - | - | - | - | - |
$1,480 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,900 Cost: $19,200 |
$4,900 | - | - | - | - | - |
$4,900 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $110,580 Cost: $136,800 |
$11,130 | - | $38,450 | 1,702 | $61,000 | - | $11,130 - kWh |
$38,450 1,702 MMBtu |
$61,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $78,100 Cost: $94,200 |
$4,900 | - | $12,200 | 1,700 | $61,000 | - | $4,900 - kWh |
$12,200 1,700 MMBtu |
$61,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product |