Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
355
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2501 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,175 | $10,269 | n/a |
UW2501 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,957 | $25,000 | n/a |
UW2501 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $8,699 | $6,545 | n/a |
UW2501 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $83,082 | $9,800 | n/a |
UW2501 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,682 | $32,756 | n/a |
OR0800 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,775 | $10,104 | n/a |
OR0800 # 01 Y:2024 | 01 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,407 | $0 | n/a |
OR0800 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,219 | $9,036 | n/a |
OR0800 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $77,631 | $300,000 | n/a |
UW2414 # 05 Y:2024 | 05 | 2024 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $57,690 | $7,906 | n/a |
UW2414 # 04 Y:2024 | 04 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $92,758 | $115,000 | n/a |
UW2414 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,019 | $162,415 | n/a |
UW2414 # 11 Y:2024 | 11 | 2024 | USE OTHER METHODS FOR NEUTRALIZATION | $13,133 | $58,000 | n/a |
UW2414 # 06 Y:2024 | 06 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $36,181 | $110,000 | n/a |
UW2414 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $220 | n/a |
UW2414 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,737 | $25,000 | n/a |
UW2414 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $812 | $1,219 | n/a |
UW2414 # 09 Y:2024 | 09 | 2024 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $252,286 | $90,000 | n/a |
UW2414 # 02 Y:2024 | 02 | 2024 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $16,683 | $96,069 | n/a |
UW2414 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,539 | $52,000 | n/a |
UW2413 # 02 Y:2024 | 02 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $25,793 | $13,368 | n/a |
UW2413 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $8,896 | $25,250 | n/a |
UW2413 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $53 | $229 | n/a |
UW2413 # 03 Y:2024 | 03 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $20,435 | $58,800 | n/a |
UW2413 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,186 | $5,713 | n/a |