IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0181 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $715 $0 Implemented
WM0181 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,587 $6,099 Not Implemented
WM0181 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $784 $0 Implemented
WM0162 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,315 $3,500 Not Implemented
WM0162 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,298 $4,575 Not Implemented
WM0162 # 01 Y:2021 01 2021 REPLACE BOILER $14,495 $38,512 Not Implemented
WM0162 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,757 $2,560 Not Implemented
WM0162 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,639 $8,039 Not Implemented
WM0162 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,584 $2,625 Not Implemented
WM0162 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,380 $2,300 Not Implemented
IC0233 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $329 $167 Not Implemented
IC0233 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,778 $2,589 Not Implemented
IC0233 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $167 Not Implemented
IC0233 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,788 $861 Not Implemented
IA0567 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,535 $1,320 Not Implemented
IA0567 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,956 $7,888 Not Implemented
IA0567 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,604 $8,596 Not Implemented
IA0567 # 05 Y:2016 05 2016 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $1,259 $500 Not Implemented
IA0567 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,409 $75,175 Not Implemented
WM0083 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $12,261 $1,680 Not Implemented
WM0083 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $27,491 $7,200 Implemented
WM0083 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $1,673 $1,425 Implemented
WM0083 # 07 Y:2016 07 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,105 $2,490 Implemented
WM0083 # 08 Y:2016 08 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $273 $695 Not Implemented
WM0083 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,901 $15,200 Implemented