IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0071 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,566 $3,150 Implemented
WM0071 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,707 $12,750 Implemented
WM0071 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,853 $230 Not Implemented
WM0071 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,489 $1,292 Not Implemented
WM0071 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,515 $7,500 Not Implemented
WM0071 # 05 Y:2015 05 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,537 $0 Implemented
WM0071 # 04 Y:2015 04 2015 USE SYNTHETIC LUBRICANT $9,301 $18,000 Implemented
WM0071 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,586 $36,000 Not Implemented
WM0071 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $104,990 $300,000 Not Implemented
WM0074 # 09 Y:2015 09 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,625 $1,774 Implemented
WM0074 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $2,174 $0 Implemented
WM0074 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,192 $0 Not Implemented
WM0074 # 03 Y:2015 03 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,126 $860 Not Implemented
WM0074 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,763 $305 Not Implemented
WM0074 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,738 $15,750 Not Implemented
WM0074 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,530 $50,000 Not Implemented
WM0074 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,746 $6,310 Not Implemented
WM0074 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $225 Implemented
WM0073 # 11 Y:2015 11 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,300 $5,570 Not Implemented
WM0073 # 05 Y:2015 05 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,166 $4,202 Not Implemented
WM0073 # 12 Y:2015 12 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,070 $391 Implemented
WM0073 # 13 Y:2015 13 2015 USE SYNTHETIC LUBRICANT $654 $1,155 Implemented
WM0073 # 16 Y:2015 16 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $310 $125 Implemented
WM0073 # 17 Y:2015 17 2015 INSTALL OCCUPANCY SENSORS $133 $268 Not Implemented
WM0073 # 14 Y:2015 14 2015 INSTALL OCCUPANCY SENSORS $520 $100 Not Implemented