IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0439 # 15 Y:2011 15 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $631 $1,000 Implemented
WV0439 # 14 Y:2011 14 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,083 $3,000 Implemented
WV0439 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $4,234 $972 Implemented
WV0439 # 10 Y:2011 10 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,477 $144 Implemented
WV0439 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,194 $468 Implemented
WV0439 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,735 $96 Implemented
WV0439 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,648 $4,000 Implemented
WV0439 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $23,664 $1,202 Implemented
WV0438 # 07 Y:2011 07 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,963 $2,000 Implemented
WV0438 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,332 $359 Implemented
WV0438 # 08 Y:2011 08 2011 DEVELOP A REPAIR/REPLACE POLICY $8,588 $629 Implemented
WV0438 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,808 $24,313 Implemented
WV0438 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $14,539 $4,000 Implemented
WV0432 # 12 Y:2011 12 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $207 $25 Implemented
WV0432 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $762 $1,000 Implemented
WV0432 # 07 Y:2011 07 2011 DEVELOP A REPAIR/REPLACE POLICY $1,677 $1,775 Implemented
WV0432 # 05 Y:2011 05 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,144 $2,000 Implemented
WV0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,762 $290 Implemented
WV0420 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,569 $14,510 Implemented
WV0420 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $480 Implemented
WV0420 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,500 $4,500 Implemented